Water Levels and Discharges  |  Reservoirs  |  Precipitation  |  Water quality Last site revision 02.08.2025 13:28
       
Water Levels and Discharges All data are without validation 02.08.2025 13:31:35
Measurement summary  02.08.2025All facilities
Reservoir River  Indikace řazeníDateUsable storage capacityControllable flood protection capacityNon-controllable flood protection capacity
filledfreefilledfreefilledfree
mil [m3][%]mil [m3][%]mil [m3][%]mil [m3][%]mil [m3][%]mil [m3][%]
 VD Vřesník  Želivka 02.08.2025 13:00 0.06 100.00 0.00 0.00 - - - - 0.002 0.85 0.239 99.15
 VD Švihov (Želivka)  Želivka 02.08.2025 13:00 225.81 91.77 20.26 8.23 - - - - 0.000 0.00 42.413 100.00
 VD Sedlice  Želivka 02.08.2025 13:00 0.66 70.03 0.28 29.97 0.000 0.00 0.096 100.00 0.000 0.00 0.350 100.00
 VD Kořensko  Vltava 02.08.2025 13:00 1.69 97.81 0.04 2.19 - - - - - - - -
 VD Orlík  Vltava 02.08.2025 13:00 195.79 57.07 147.29 42.93 0.000 0.00 93.422 100.00 - - - -
 VD Lipno 2  Vltava 02.08.2025 13:00 0.91 63.46 0.53 36.54 - - - - - - - -
 VD Lipno 1  Vltava 02.08.2025 13:00 182.14 72.00 70.85 28.00 0.000 0.00 33.156 100.00 - - - -
 VD Slapy  Vltava 02.08.2025 13:00 188.05 93.79 12.45 6.21 - - - - - - - -
 VD Štěchovice  Vltava 02.08.2025 13:00 2.03 48.35 2.17 51.65 - - - - - - - -
 VD Vrané  Vltava 02.08.2025 13:00 2.29 90.59 0.24 9.41 - - - - - - - -
 VD Hněvkovice  Vltava 02.08.2025 13:00 10.16 83.60 1.99 16.40 - - - - - - - -
 VD Kamýk  Vltava 02.08.2025 13:00 1.28 27.47 3.37 72.53 - - - - - - - -
 VD Nýrsko  Úhlava 02.08.2025 13:00 14.36 89.95 1.60 10.05 0.000 0.00 2.008 100.00 0.000 0.00 1.812 100.00
 VD Trnávka  Trnava 02.08.2025 13:00 1.54 72.62 0.58 27.38 - - - - 0.000 0.00 1.365 100.00
 VD Suchomasty  Suchomastský potok 02.08.2025 13:00 0.41 100.00 0.00 0.00 - - - - 0.001 1.24 0.072 98.76
 VD Karhof  Studenský potok 02.08.2025 13:00 0.26 88.54 0.03 11.46 - - - - 0.000 0.00 0.175 100.00
 VD Zhejral  Studenský potok 02.08.2025 13:00 0.16 100.00 0.00 0.00 - - - - 0.004 3.14 0.127 96.86
 VD Strž  Stržský potok 02.08.2025 13:00 0.25 84.09 0.05 15.91 - - - - 0.000 0.00 0.136 100.00
 VD Humenice  Stropnice 02.08.2025 13:00 0.11 87.89 0.01 12.11 0.000 0.00 0.485 100.00 0.000 0.00 0.184 100.00
 VD Žlutice  Střela 02.08.2025 13:00 7.56 73.55 2.72 26.45 0.000 0.00 1.309 100.00 0.000 0.00 2.810 100.00
 VD Staviště  Staviště 02.08.2025 13:00 0.37 95.35 0.02 4.65 - - - - 0.000 0.00 0.139 100.00
 VD Němčice  Sedlický potok
 VD Pilská u Žďáru  Sázava 02.08.2025 13:00 1.33 91.64 0.12 8.36 - - - - 0.000 0.00 0.394 100.00
 VD České Údolí  Radbuza 02.08.2025 13:00 2.37 94.66 0.13 5.34 - - - - 0.000 0.00 2.141 100.00
 VD Pilská (u Příbramě)  Pilský potok 02.08.2025 13:00 0.96 71.23 0.39 28.77 - - - - 0.000 0.00 0.282 100.00
 VD Obecnice  Obecnický potok 02.08.2025 13:00 0.43 79.73 0.11 20.27 - - - - 0.000 0.00 0.160 100.00
 VD Hracholusky  Mže 02.08.2025 13:00 23.37 72.97 8.65 27.03 0.000 0.00 4.579 100.00 0.000 0.00 12.921 100.00
 VD Lučina  Mže 02.08.2025 13:00 2.55 73.95 0.90 26.05 0.000 0.00 0.798 100.00 0.000 0.00 1.140 100.00
 VD Římov  Malše 02.08.2025 13:00 26.38 87.89 3.64 12.11 0.000 0.00 1.552 100.00 0.000 0.00 0.169 100.00
 VD Láz  Litavka 02.08.2025 13:00 0.68 83.84 0.13 16.16 - - - - 0.000 0.00 0.132 100.00
 VD Klíčava  Klíčava 02.08.2025 13:00 7.41 94.31 0.45 5.69 0.000 0.00 0.573 100.00 0.000 0.00 1.598 100.00
 VD Dolejší Padrťský rybník  Klabava
 VD Hořejší Padrťský rybník  Klabava
 VD Klabava  Klabava 02.08.2025 13:00 0.28 56.42 0.21 43.58 - - - - 0.000 0.00 4.473 100.00
 VD Záskalská  Červený potok (BE) 02.08.2025 13:00 0.60 100.00 0.00 0.00 - - - - 0.002 2.05 0.076 97.95
 VD Dráteník  Červený potok (BE) 02.08.2025 13:00 0.08 100.00 0.00 0.00 - - - - 0.000 0.37 0.051 99.63
 VD Soběnov  Černá 02.08.2025 13:00 0.02 30.19 0.04 69.81 - - - - 0.000 0.00 0.098 100.00
 VD Husinec  Blanice (PI) 02.08.2025 13:00 1.84 89.15 0.22 10.85 0.000 0.00 2.814 100.00 0.000 0.00 0.909 100.00
 VD Bílsko  Bílský potok
The values of capacities in the reservoirs that are at least partially filled with water are indicated in bold. Explanation: The dash - the water reservoir does not have a given capacity, the blank field of the table - the value is not measured (measurement or transmission failure).
Schema of capacities:
  Povodí Vltavy, státní podnik © 2025 The system uses also data from measuring stations of   Czech Hydrometeorological Institute © 2025 Application developed by   MGE Data s.r.o. © 1996 - 2024