Water Levels and Discharges  |  Reservoirs  |  Precipitation  |  Water quality Last site revision 01.08.2025 16:06
       
Water Levels and Discharges All data are without validation 01.08.2025 16:11:01
Measurement summary  01.08.2025All facilities
Reservoir River DateUsable storage capacityControllable flood protection capacityNon-controllable flood protection capacity
filledfreefilledfreefilledfree
mil [m3][%]mil [m3][%]mil [m3][%]mil [m3][%]mil [m3][%]mil [m3][%]
 VD Bílsko  Bílský potok
 VD České Údolí  Radbuza 01.08.2025 16:00 2.33 93.24 0.17 6.76 - - - - 0.000 0.00 2.141 100.00
 VD Dolejší Padrťský rybník  Klabava
 VD Dráteník  Červený potok (BE) 01.08.2025 16:00 0.08 100.00 0.00 0.00 - - - - 0.000 0.15 0.051 99.85
 VD Hněvkovice  Vltava 01.08.2025 16:00 9.91 81.50 2.25 18.50 - - - - - - - -
 VD Hořejší Padrťský rybník  Klabava
 VD Hracholusky  Mže 01.08.2025 16:00 23.41 73.11 8.61 26.89 0.000 0.00 4.579 100.00 0.000 0.00 12.921 100.00
 VD Humenice  Stropnice 01.08.2025 16:00 0.11 90.85 0.01 9.15 0.000 0.00 0.485 100.00 0.000 0.00 0.184 100.00
 VD Husinec  Blanice (PI) 01.08.2025 16:00 1.85 90.07 0.20 9.93 0.000 0.00 2.814 100.00 0.000 0.00 0.909 100.00
 VD Kamýk  Vltava 01.08.2025 16:00 1.08 23.19 3.57 76.81 - - - - - - - -
 VD Karhof  Studenský potok 01.08.2025 16:00 0.26 88.54 0.03 11.46 - - - - 0.000 0.00 0.175 100.00
 VD Klabava  Klabava 01.08.2025 16:00 0.31 62.43 0.18 37.57 - - - - 0.000 0.00 4.473 100.00
 VD Klíčava  Klíčava 01.08.2025 16:00 7.42 94.36 0.44 5.64 0.000 0.00 0.573 100.00 0.000 0.00 1.598 100.00
 VD Kořensko  Vltava 01.08.2025 16:00 1.70 98.42 0.03 1.58 - - - - - - - -
 VD Láz  Litavka 01.08.2025 16:00 0.68 83.92 0.13 16.08 - - - - 0.000 0.00 0.132 100.00
 VD Lipno 1  Vltava 01.08.2025 16:00 182.93 72.31 70.06 27.69 0.000 0.00 33.156 100.00 - - - -
 VD Lipno 2  Vltava 01.08.2025 16:00 0.54 37.16 0.91 62.84 - - - - - - - -
 VD Lučina  Mže 01.08.2025 16:00 2.56 74.04 0.90 25.96 0.000 0.00 0.798 100.00 0.000 0.00 1.140 100.00
 VD Němčice  Sedlický potok 01.08.2025 12:00 0.10 100.00 0.00 0.00 - - - - 0.001 0.25 0.319 99.75
 VD Nýrsko  Úhlava 01.08.2025 16:00 14.34 89.83 1.62 10.17 0.000 0.00 2.008 100.00 0.000 0.00 1.812 100.00
 VD Obecnice  Obecnický potok 01.08.2025 16:00 0.43 79.86 0.11 20.14 - - - - 0.000 0.00 0.160 100.00
 VD Orlík  Vltava 01.08.2025 16:00 196.69 57.33 146.39 42.67 0.000 0.00 93.422 100.00 - - - -
 VD Pilská (u Příbramě)  Pilský potok 01.08.2025 16:00 0.96 71.38 0.38 28.62 - - - - 0.000 0.00 0.282 100.00
 VD Pilská u Žďáru  Sázava 01.08.2025 16:00 1.33 91.67 0.12 8.33 - - - - 0.000 0.00 0.394 100.00
 VD Římov  Malše 01.08.2025 16:00 26.46 88.14 3.56 11.86 0.000 0.00 1.552 100.00 0.000 0.00 0.169 100.00
 VD Sedlice  Želivka 01.08.2025 16:00 0.67 71.33 0.27 28.67 0.000 0.00 0.096 100.00 0.000 0.00 0.350 100.00
 VD Slapy  Vltava 01.08.2025 16:00 187.93 93.73 12.57 6.27 - - - - - - - -
 VD Soběnov  Černá 01.08.2025 16:00 0.02 28.88 0.04 71.12 - - - - 0.000 0.00 0.098 100.00
 VD Staviště  Staviště 01.08.2025 16:00 0.37 95.41 0.02 4.59 - - - - 0.000 0.00 0.139 100.00
 VD Štěchovice  Vltava 01.08.2025 16:00 3.34 79.43 0.87 20.57 - - - - - - - -
 VD Strž  Stržský potok 01.08.2025 15:00 0.26 85.01 0.05 14.99 - - - - 0.000 0.00 0.136 100.00
 VD Suchomasty  Suchomastský potok 01.08.2025 16:00 0.41 100.00 0.00 0.00 - - - - 0.001 1.24 0.072 98.76
 VD Švihov (Želivka)  Želivka 01.08.2025 16:00 226.04 91.86 20.03 8.14 - - - - 0.000 0.00 42.413 100.00
 VD Trnávka  Trnava 01.08.2025 16:00 1.54 72.58 0.58 27.42 - - - - 0.000 0.00 1.365 100.00
 VD Vrané  Vltava 01.08.2025 16:00 1.18 46.74 1.34 53.26 - - - - - - - -
 VD Vřesník  Želivka 01.08.2025 16:00 0.06 100.00 0.00 0.00 - - - - 0.001 0.22 0.240 99.78
 VD Záskalská  Červený potok (BE) 01.08.2025 16:00 0.60 100.00 0.00 0.00 - - - - 0.002 2.51 0.075 97.49
 VD Zhejral  Studenský potok 01.08.2025 16:00 0.16 100.00 0.00 0.00 - - - - 0.004 3.28 0.127 96.72
 VD Žlutice  Střela 01.08.2025 16:00 7.58 73.74 2.70 26.26 0.000 0.00 1.309 100.00 0.000 0.00 2.810 100.00
The values of capacities in the reservoirs that are at least partially filled with water are indicated in bold. Explanation: The dash - the water reservoir does not have a given capacity, the blank field of the table - the value is not measured (measurement or transmission failure).
Schema of capacities:
  Povodí Vltavy, státní podnik © 2025 The system uses also data from measuring stations of   Czech Hydrometeorological Institute © 2025 Application developed by   MGE Data s.r.o. © 1996 - 2024