Water Levels and Discharges  |  Reservoirs  |  Precipitation  |  Water quality Last site revision 08.05.2026 16:44
       
Water Levels and Discharges All data are without validation 08.05.2026 16:47:16
Measurement summary  08.05.2026All facilities
Reservoir River DateUsable storage capacityControllable flood protection capacityNon-controllable flood protection capacity
filledfreefilledfreefilledfree
mil [m3][%]mil [m3][%]mil [m3][%]mil [m3][%]mil [m3][%]mil [m3][%]
 VD Bílsko  Bílský potok
 VD České Údolí  Radbuza 08.05.2026 16:00 2.50 99.95 0.00 0.05 - - - - 0.000 0.00 2.141 100.00
 VD Dolejší Padrťský rybník  Klabava
 VD Dráteník  Červený potok (BE) 08.05.2026 16:00 0.08 100.00 0.00 0.00 - - - - 0.002 3.07 0.050 96.93
 VD Hněvkovice  Vltava 08.05.2026 16:00 10.53 86.61 1.63 13.39 - - - - - - - -
 VD Hořejší Padrťský rybník  Klabava
 VD Hracholusky  Mže 08.05.2026 16:00 29.50 92.13 2.52 7.87 0.000 0.00 4.579 100.00 0.000 0.00 12.921 100.00
 VD Humenice  Stropnice 08.05.2026 16:00 0.10 84.84 0.02 15.16 0.000 0.00 0.485 100.00 0.000 0.00 0.184 100.00
 VD Husinec  Blanice (PI) 08.05.2026 16:00 1.66 80.41 0.40 19.59 0.000 0.00 2.814 100.00 0.000 0.00 0.909 100.00
 VD Kamýk  Vltava 08.05.2026 16:00 1.62 34.79 3.03 65.21 - - - - - - - -
 VD Karhof  Studenský potok 08.05.2026 16:00 0.28 96.63 0.01 3.37 - - - - 0.000 0.00 0.175 100.00
 VD Klabava  Klabava 08.05.2026 16:00 0.28 56.81 0.21 43.19 - - - - 0.000 0.00 4.473 100.00
 VD Klíčava  Klíčava 08.05.2026 16:00 7.48 95.17 0.38 4.83 0.000 0.00 0.573 100.00 0.000 0.00 1.598 100.00
 VD Kořensko  Vltava 08.05.2026 16:00 1.69 97.60 0.04 2.40 - - - - - - - -
 VD Láz  Litavka 08.05.2026 16:00 0.74 90.78 0.08 9.22 - - - - 0.000 0.00 0.132 100.00
 VD Lipno 1  Vltava 08.05.2026 16:00 179.79 71.07 73.20 28.93 0.000 0.00 33.156 100.00 - - - -
 VD Lipno 2  Vltava 08.05.2026 16:00 0.99 68.46 0.45 31.54 - - - - - - - -
 VD Lučina  Mže 08.05.2026 16:00 3.02 87.32 0.44 12.68 0.000 0.00 0.798 100.00 0.000 0.00 1.140 100.00
 VD Němčice  Sedlický potok 08.05.2026 16:00 0.10 100.00 0.00 0.00 - - - - 0.003 1.08 0.316 98.92
 VD Nýrsko  Úhlava 08.05.2026 16:00 14.95 93.65 1.01 6.35 0.000 0.00 2.008 100.00 0.000 0.00 1.812 100.00
 VD Obecnice  Obecnický potok 08.05.2026 16:00 0.45 84.50 0.08 15.50 - - - - 0.000 0.00 0.160 100.00
 VD Orlík  Vltava 08.05.2026 16:00 278.19 81.09 64.89 18.91 0.000 0.00 93.422 100.00 - - - -
 VD Pilská (u Příbramě)  Pilský potok 08.05.2026 16:00 1.23 91.70 0.11 8.30 - - - - 0.000 0.00 0.282 100.00
 VD Pilská u Žďáru  Sázava
 VD Římov  Malše 08.05.2026 16:00 24.69 82.25 5.33 17.75 0.000 0.00 1.552 100.00 0.000 0.00 0.169 100.00
 VD Sedlice  Želivka 08.05.2026 16:00 0.71 74.97 0.24 25.03 0.000 0.00 0.096 100.00 0.000 0.00 0.350 100.00
 VD Slapy  Vltava 08.05.2026 16:00 196.73 98.12 3.77 1.88 - - - - - - - -
 VD Soběnov  Černá 08.05.2026 16:00 0.01 16.09 0.05 83.91 - - - - 0.000 0.00 0.098 100.00
 VD Staviště  Staviště 08.05.2026 16:00 0.38 98.44 0.01 1.56 - - - - 0.000 0.00 0.139 100.00
 VD Štěchovice  Vltava 08.05.2026 16:00 3.15 74.79 1.06 25.21 - - - - - - - -
 VD Strž  Stržský potok 08.05.2026 16:00 0.27 90.55 0.03 9.45 - - - - 0.000 0.00 0.136 100.00
 VD Suchomasty  Suchomastský potok 08.05.2026 16:00 0.41 99.85 0.00 0.15 - - - - 0.000 0.00 0.073 100.00
 VD Švihov (Želivka)  Želivka 08.05.2026 16:00 225.09 91.48 20.97 8.52 - - - - 0.000 0.00 42.413 100.00
 VD Trnávka  Trnava 08.05.2026 16:00 1.87 87.88 0.26 12.12 - - - - 0.000 0.00 1.365 100.00
 VD Vrané  Vltava 08.05.2026 16:00 1.63 64.81 0.89 35.19 - - - - - - - -
 VD Vřesník  Želivka 08.05.2026 16:00 0.05 96.20 0.00 3.80 - - - - 0.000 0.00 0.241 100.00
 VD Záskalská  Červený potok (BE) 08.05.2026 16:00 0.60 100.00 0.00 0.00 - - - - 0.002 2.20 0.075 97.80
 VD Zhejral  Studenský potok 08.05.2026 16:00 0.16 100.00 0.00 0.00 - - - - 0.004 2.92 0.128 97.08
 VD Žlutice  Střela 08.05.2026 16:00 8.82 85.82 1.46 14.18 0.000 0.00 1.309 100.00 0.000 0.00 2.810 100.00
The values of capacities in the reservoirs that are at least partially filled with water are indicated in bold. Explanation: The dash - the water reservoir does not have a given capacity, the blank field of the table - the value is not measured (measurement or transmission failure).
Schema of capacities:
  Povodí Vltavy, státní podnik © 2026 The system uses also data from measuring stations of   Czech Hydrometeorological Institute © 2026 Application developed by   MGE Data s.r.o. © 1996 - 2024