Water Levels and Discharges  |  Reservoirs  |  Precipitation  |  Water quality Last site revision 02.08.2025 06:10
       
Water Levels and Discharges All data are without validation 02.08.2025 06:11:42
Measurement summary  02.08.2025All facilities
Reservoir River  Indikace řazeníDateUsable storage capacityControllable flood protection capacityNon-controllable flood protection capacity
filledfreefilledfreefilledfree
mil [m3][%]mil [m3][%]mil [m3][%]mil [m3][%]mil [m3][%]mil [m3][%]
 VD Bílsko  Bílský potok
 VD Husinec  Blanice (PI) 02.08.2025 06:00 1.84 89.42 0.22 10.58 0.000 0.00 2.814 100.00 0.000 0.00 0.909 100.00
 VD Soběnov  Černá 02.08.2025 06:00 0.02 30.47 0.04 69.53 - - - - 0.000 0.00 0.098 100.00
 VD Záskalská  Červený potok (BE) 02.08.2025 06:00 0.60 100.00 0.00 0.00 - - - - 0.002 2.20 0.075 97.80
 VD Dráteník  Červený potok (BE) 02.08.2025 06:00 0.08 100.00 0.00 0.00 - - - - 0.000 0.37 0.051 99.63
 VD Dolejší Padrťský rybník  Klabava
 VD Klabava  Klabava 02.08.2025 06:00 0.29 58.17 0.21 41.83 - - - - 0.000 0.00 4.473 100.00
 VD Hořejší Padrťský rybník  Klabava
 VD Klíčava  Klíčava 02.08.2025 06:00 7.41 94.32 0.45 5.68 0.000 0.00 0.573 100.00 0.000 0.00 1.598 100.00
 VD Láz  Litavka 02.08.2025 06:00 0.68 83.84 0.13 16.16 - - - - 0.000 0.00 0.132 100.00
 VD Římov  Malše 02.08.2025 06:00 26.40 87.95 3.62 12.05 0.000 0.00 1.552 100.00 0.000 0.00 0.169 100.00
 VD Hracholusky  Mže 02.08.2025 06:00 23.41 73.09 8.62 26.91 0.000 0.00 4.579 100.00 0.000 0.00 12.921 100.00
 VD Lučina  Mže 02.08.2025 06:00 2.56 73.99 0.90 26.01 0.000 0.00 0.798 100.00 0.000 0.00 1.140 100.00
 VD Obecnice  Obecnický potok 02.08.2025 06:00 0.43 79.77 0.11 20.23 - - - - 0.000 0.00 0.160 100.00
 VD Pilská (u Příbramě)  Pilský potok 02.08.2025 06:00 0.96 71.28 0.39 28.72 - - - - 0.000 0.00 0.282 100.00
 VD České Údolí  Radbuza 02.08.2025 06:00 2.35 93.97 0.15 6.03 - - - - 0.000 0.00 2.141 100.00
 VD Pilská u Žďáru  Sázava 02.08.2025 06:00 1.33 91.74 0.12 8.26 - - - - 0.000 0.00 0.394 100.00
 VD Němčice  Sedlický potok 01.08.2025 12:00 0.10 100.00 0.00 0.00 - - - - 0.001 0.25 0.319 99.75
 VD Staviště  Staviště 02.08.2025 06:00 0.37 95.41 0.02 4.59 - - - - 0.000 0.00 0.139 100.00
 VD Žlutice  Střela 02.08.2025 06:00 7.57 73.62 2.71 26.38 0.000 0.00 1.309 100.00 0.000 0.00 2.810 100.00
 VD Humenice  Stropnice 02.08.2025 06:00 0.11 88.84 0.01 11.16 0.000 0.00 0.485 100.00 0.000 0.00 0.184 100.00
 VD Strž  Stržský potok 02.08.2025 05:00 0.26 84.58 0.05 15.42 - - - - 0.000 0.00 0.136 100.00
 VD Karhof  Studenský potok 02.08.2025 06:00 0.26 88.61 0.03 11.39 - - - - 0.000 0.00 0.175 100.00
 VD Zhejral  Studenský potok 02.08.2025 06:00 0.16 100.00 0.00 0.00 - - - - 0.004 3.21 0.127 96.79
 VD Suchomasty  Suchomastský potok 02.08.2025 06:00 0.41 100.00 0.00 0.00 - - - - 0.000 0.00 0.073 100.00
 VD Trnávka  Trnava 02.08.2025 06:00 1.54 72.58 0.58 27.42 - - - - 0.000 0.00 1.365 100.00
 VD Nýrsko  Úhlava 02.08.2025 06:00 14.36 89.92 1.61 10.08 0.000 0.00 2.008 100.00 0.000 0.00 1.812 100.00
 VD Kořensko  Vltava 02.08.2025 06:00 1.71 98.56 0.02 1.44 - - - - - - - -
 VD Lipno 2  Vltava 02.08.2025 06:00 1.01 69.88 0.43 30.12 - - - - - - - -
 VD Vrané  Vltava 02.08.2025 06:00 2.27 90.11 0.25 9.89 - - - - - - - -
 VD Lipno 1  Vltava 02.08.2025 06:00 182.14 72.00 70.85 28.00 0.000 0.00 33.156 100.00 - - - -
 VD Hněvkovice  Vltava 02.08.2025 06:00 10.06 82.75 2.10 17.25 - - - - - - - -
 VD Kamýk  Vltava 02.08.2025 06:00 1.24 26.65 3.41 73.35 - - - - - - - -
 VD Orlík  Vltava 02.08.2025 06:00 195.61 57.02 147.47 42.98 0.000 0.00 93.422 100.00 - - - -
 VD Slapy  Vltava 02.08.2025 06:00 188.13 93.83 12.37 6.17 - - - - - - - -
 VD Štěchovice  Vltava 02.08.2025 06:00 3.11 73.80 1.10 26.20 - - - - - - - -
 VD Švihov (Želivka)  Želivka 02.08.2025 06:00 225.88 91.79 20.19 8.21 - - - - 0.000 0.00 42.413 100.00
 VD Sedlice  Želivka 02.08.2025 06:00 0.67 71.30 0.27 28.70 0.000 0.00 0.096 100.00 0.000 0.00 0.350 100.00
 VD Vřesník  Želivka 02.08.2025 06:00 0.05 95.57 0.00 4.43 - - - - 0.000 0.00 0.241 100.00
The values of capacities in the reservoirs that are at least partially filled with water are indicated in bold. Explanation: The dash - the water reservoir does not have a given capacity, the blank field of the table - the value is not measured (measurement or transmission failure).
Schema of capacities:
  Povodí Vltavy, státní podnik © 2025 The system uses also data from measuring stations of   Czech Hydrometeorological Institute © 2025 Application developed by   MGE Data s.r.o. © 1996 - 2024