Water Levels and Discharges  |  Reservoirs  |  Precipitation  |  Water quality Last site revision 02.05.2024 05:09
       
Water Levels and Discharges All data are without validation 02.05.2024 05:10:17
Measurement summary  02.05.2024All facilities
Reservoir River  Indikace řazeníDateUsable storage capacityControllable flood protection capacityNon-controllable flood protection capacity
filledfreefilledfreefilledfree
mil [m3][%]mil [m3][%]mil [m3][%]mil [m3][%]mil [m3][%]mil [m3][%]
 VD Bílsko  Bílský potok
 VD Husinec  Blanice (PI) 02.05.2024 05:00 1.85 89.71 0.21 10.29 0.000 0.00 2.814 100.00 0.000 0.00 0.909 100.00
 VD Soběnov  Černá 02.05.2024 05:00 0.01 11.61 0.06 88.39 - - - - 0.000 0.00 0.098 100.00
 VD Záskalská  Červený potok (BE) 02.05.2024 05:00 0.60 100.00 0.00 0.00 - - - - 0.002 2.35 0.075 97.65
 VD Dráteník  Červený potok (BE) 02.05.2024 05:00 0.08 98.67 0.00 1.33 - - - - 0.000 0.00 0.051 100.00
 VD Dolejší Padrťský rybník  Klabava
 VD Klabava  Klabava 02.05.2024 05:00 0.28 57.85 0.21 42.15 - - - - 0.000 0.00 4.473 100.00
 VD Hořejší Padrťský rybník  Klabava
 VD Klíčava  Klíčava 02.05.2024 05:00 7.56 96.22 0.30 3.78 0.000 0.00 0.573 100.00 0.000 0.00 1.598 100.00
 VD Láz  Litavka 02.05.2024 05:00 0.75 91.87 0.07 8.13 - - - - 0.000 0.00 0.132 100.00
 VD Římov  Malše 02.05.2024 05:00 26.11 86.99 3.90 13.01 0.000 0.00 1.552 100.00 0.000 0.00 0.169 100.00
 VD Hracholusky  Mže 02.05.2024 05:00 29.69 92.73 2.33 7.27 0.000 0.00 4.579 100.00 0.000 0.00 12.921 100.00
 VD Lučina  Mže 02.05.2024 05:00 3.14 90.82 0.32 9.18 0.000 0.00 0.798 100.00 0.000 0.00 1.140 100.00
 VD Obecnice  Obecnický potok 02.05.2024 05:00 0.47 87.07 0.07 12.93 - - - - 0.000 0.00 0.160 100.00
 VD Pilská (u Příbramě)  Pilský potok 02.05.2024 05:00 1.25 93.04 0.09 6.96 - - - - 0.000 0.00 0.282 100.00
 VD České Údolí  Radbuza 02.05.2024 05:00 2.49 99.50 0.01 0.50 - - - - 0.000 0.00 2.141 100.00
 VD Pilská u Žďáru  Sázava 02.05.2024 05:00 1.43 98.53 0.02 1.47 - - - - 0.000 0.00 0.394 100.00
 VD Němčice  Sedlický potok 02.05.2024 05:00 0.10 100.00 0.00 0.00 - - - - 0.004 1.26 0.316 98.74
 VD Staviště  Staviště 02.05.2024 05:00 0.39 99.78 0.00 0.22 - - - - 0.000 0.00 0.139 100.00
 VD Žlutice  Střela 02.05.2024 05:00 9.52 92.57 0.76 7.43 0.000 0.00 1.309 100.00 0.000 0.00 2.810 100.00
 VD Humenice  Stropnice 02.05.2024 05:00 0.09 71.61 0.03 28.39 0.000 0.00 0.485 100.00 0.000 0.00 0.184 100.00
 VD Strž  Stržský potok 02.05.2024 04:00 0.30 99.76 0.00 0.24 - - - - 0.000 0.00 0.136 100.00
 VD Karhof  Studenský potok 02.05.2024 05:00 0.28 97.81 0.01 2.19 - - - - 0.000 0.00 0.175 100.00
 VD Zhejral  Studenský potok 02.05.2024 05:00 0.16 100.00 0.00 0.00 - - - - 0.005 3.50 0.127 96.50
 VD Suchomasty  Suchomastský potok 02.05.2024 05:00 0.41 99.74 0.00 0.26 - - - - 0.000 0.00 0.073 100.00
 VD Trnávka  Trnava 02.05.2024 05:00 2.00 94.24 0.12 5.76 - - - - 0.000 0.00 1.365 100.00
 VD Nýrsko  Úhlava 02.05.2024 05:00 14.98 93.86 0.98 6.14 0.000 0.00 2.008 100.00 0.000 0.00 1.812 100.00
 VD Kořensko  Vltava 02.05.2024 05:00 1.68 97.16 0.05 2.84 - - - - - - - -
 VD Lipno 2  Vltava 02.05.2024 05:00 0.58 40.43 0.86 59.57 - - - - - - - -
 VD Vrané  Vltava 02.05.2024 05:00 0.55 21.76 1.97 78.24 - - - - - - - -
 VD Lipno 1  Vltava 02.05.2024 05:00 211.37 83.55 41.62 16.45 0.000 0.00 33.156 100.00 - - - -
 VD Hněvkovice  Vltava 02.05.2024 05:00 9.07 74.59 3.09 25.41 - - - - - - - -
 VD Kamýk  Vltava 02.05.2024 05:00 1.23 26.42 3.42 73.58 - - - - - - - -
 VD Orlík  Vltava 02.05.2024 05:00 204.75 59.68 138.33 40.32 0.000 0.00 93.422 100.00 - - - -
 VD Slapy  Vltava 02.05.2024 05:00 193.35 96.44 7.15 3.56 - - - - - - - -
 VD Štěchovice  Vltava 02.05.2024 05:00 1.63 38.64 2.58 61.36 - - - - - - - -
 VD Švihov (Želivka)  Želivka 02.05.2024 05:00 242.26 98.45 3.80 1.55 - - - - 0.000 0.00 42.413 100.00
 VD Sedlice  Želivka 02.05.2024 05:00 0.59 62.74 0.35 37.26 0.000 0.00 0.096 100.00 0.000 0.00 0.350 100.00
 VD Vřesník  Želivka 02.05.2024 05:00 0.05 94.32 0.00 5.68 - - - - 0.000 0.00 0.241 100.00
The values of capacities in the reservoirs that are at least partially filled with water are indicated in bold. Explanation: The dash - the water reservoir does not have a given capacity, the blank field of the table - the value is not measured (measurement or transmission failure).
Schema of capacities:
  Povodí Vltavy, státní podnik © 2024 The system uses also data from measuring stations of   Czech Hydrometeorological Institute © 2024 Application developed by   MGE Data s.r.o. © 1996 - 2018